1) The full cost stack (what you’re really paying for)
Think of a borehole like a system, not a hole. The “drilling” stage is only one component. A professional setup verifies yield and chemistry before you commit to pumps and treatment.
- ✓Survey
Reduces blind drilling and helps estimate a realistic depth range. - ✓Drilling
Charged per meter or as a package—depth strongly affects cost. - ✓Casing + gravel pack + sanitary seal
Build quality and contamination protection; often excluded in “cheap” quotes. - ✓Development
Flushes fines; stabilizes yield and clarity. - ✓Test pumping + reporting
Confirms sustainable yield and drawdown behavior. - ✓Sampling + lab tests
EC/TDS, pH, fluoride, hardness, iron/manganese, microbiology if drinking. - ✓Pump + power + storage
Solar vs grid, controller/protection, pipes, tanks—big cost swing area. - ✓Treatment (only if lab confirms)
Match solutions to parameters; avoid guessing.
2) Top cost drivers in Kenya
- 1Depth (meters drilled)
More meters usually means more time, fuel, and consumables. - 2Geology
Hard or unstable formations can increase difficulty and casing requirements. - 3Casing strategy
Diameter/grade/length, gravel pack, sanitary sealing—this is where “cheap” becomes expensive. - 4Yield target
Higher yield needs stronger zones and better verification (test pumping). - 5Pump & power choice
Solar systems, controllers, and protections can significantly change total cost.
3) Stage-by-stage cost breakdown (what to expect in a quote)
- Survey fee (deliverables stated)
- Drilling rate per meter (and what it includes)
- Mobilization/transport (fixed or variable)
- Casing specs (diameter/grade/length) + pricing method
- Gravel pack + sanitary seal (specs)
- Development (method included)
- Test pumping (hours + report)
- Sampling + lab tests (parameters listed)
- Pump installation scope (pipes, cable, fittings)
- Power system (solar/grid/generator) scope
- Storage tanks + plumbing to point-of-use
- Optional treatment (lab-based only)
5) How to compare quotes fairly
Don’t compare totals until the deliverables match. Standardize first, then choose.
- Per-meter drilling rate + inclusions
- Depth range assumption (from survey)
- Casing diameter/grade/length
- Gravel pack + sanitary seal method
- Development method
- Test pumping hours + reporting
- Lab testing scope (parameters)
- Pump installation scope
- Power setup scope (solar/grid)
- Warranty + after-sales support
6) Budget planning approach (without guessing)
- 1Start with survey depth range
Budget using a range (low/likely/high) so you’re not shocked later. - 2Ask for itemized totals at those depths
This reveals how each company handles casing, testing, and mobilization. - 3Verify yield then size pump
Test pumping prevents wrong pump/solar spend. - 4Test water then choose treatment
Treatment should target the parameters your lab report confirms.
Want a realistic Kenya borehole budget for your exact site?
Share your county, area name, intended use (home/rentals/farm), estimated daily litres, and power preference (solar/grid). If you already have a survey or quote, send it and we’ll help you spot missing steps and hidden costs.
7) Mini decision tool (cost planning next step)
Use this to choose your next action: get a survey, demand itemization, or insist on test pumping/lab tests.
8) FAQ
How much does it cost to drill a borehole in Kenya in 2026?
Total cost depends on depth, geology, casing requirements, test pumping, and the pump/power/storage setup. The safest way to budget is to get a survey-based depth range and compare itemized quotes that include casing, development, test pumping, and water testing.
What costs are often excluded from borehole drilling quotes?
Common exclusions include casing and gravel pack, sanitary seal, development, test pumping, sampling and lab tests, mobilization/transport, pump installation, electrical/solar setup, storage tanks, and any treatment system.
What is the best way to compare drilling companies?
Compare the same deliverables: drilling rate per meter, casing specs, gravel pack and sanitary seal, development method, test pumping duration and reporting, water testing scope, pump installation scope, warranty and after-sales support.